格式:pdf
大小:179KB
頁數: 2頁
道路二灰碎石路拌法施工經驗——結合南水北調S30標渠頂道路施工情況,參照有關技術規范并結合施工實踐,介紹了二灰碎石路拌法施工工藝和施工經驗。實踐證明:S30標采取的施工工藝和施工經驗,對二灰碎石施工的質量控制是有效的。
格式:pdf
大?。?span class="single-tag-height">219KB
頁數: 21頁
Kangda College of Na njing Me dical University (pharmacy /f/nursi ng/f); constr ucti on site s: the Nort h West si de of mountain r oad, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; t he West part of the nursing 1 underground; refractory grade, buil ding height : 25.45m; standard floors: 4.5M total area: 13979 square time: 251 days. This project consists of Jiangsu run investme n